JJB Architect

K-12 Educational

Project Name

Location

Company

My Role

Year

Pontotoc High School Field House

Pontotoc, MS

Pryor & Morrow Architects

Intern Architect

Most of the schematic design

Most of design development

Most of the construction documents

Renderings

2003

St Patrick High School

Biloxi, MS

Guild Hardy Architects (Now Eley Guild Hardy Architects)

Some of the construction documents

2006

Storm Damage Assessment for Long Beach School District

Long Beach, MS

-

Modeled and drew existing facilities for renovations

2006

Itawamba Agricultural High School Football Stadium & Track

Fulton, MS

Location

Intern Architect

Most of schematic design

Modeled and drew existing facilities for renovations

Most of design development

Most of the construction documents

2007

Security Analysis for Tuscaloosa City Schools

Tuscaloosa, AL

Ellis Architects

Architect

Some of schematic design

Most of design development

Most of the construction documents

Modeled and drew existing facilities for renovations

2013

Sonnie Hereford Elementary School

Huntsville, AL

Ellis Architects

Architect

Wrote Specifications

2014

  • Location: Pontotoc, MS
  • My Role: Intern Architect, Most of the schematic design, Most of design development, Most of construction documents, Renderings.
  • Location: Biloxi, MS
  • My Role: Some of the construction documents.
  • Location: Long Beach, MS
  • My Role: Modeled and drew existing facilities for renovations
  • Location: Fulton, MS
  • My Role: Intern Architect, Most of schematic design, Modeled and drew existing facilities for renovations, Most of design development, Most of the construction documents
  • Location: Tuscaloosa, AL
  • My Role: Architect, Some of schematic design, Most of design development, Most of the construction documents, Modeled and drew existing facilities for renovations
  • Location: Huntsville, AL
  • My Role: Architect, Wrote specifications