JJB Architect

McCallum Hall Laboratory space Renovation at the UAB School of Medicine

Company:

John J Bailey Architect as subcontractor for CCR Architecture & Interiors & HDR Architects

About this Project:

Renovation of the existing exterior cladding and medical research laboratory space on the top two floors of a nine-story research and classroom building at the University of Alabama at Birmingham (UAB) School of Medicine. ( While some exterior images reflect changes to the entire building envelope, my role focused specifically on the renovation of the exterior and interior spaces on the top two levels. The project required extensive coordination with a wide range of stakeholders across UAB. During the construction administration phase, I served as the primary onsite representative for the architectural team. )

Project Location:

Birmingham, AL

Year:

2018

My Role:

Architect

Construction administration

Technical drawings